1·Upon completion, the railway will shorten the travel time of a passenger train between Lanzhou and Chongqing from 17.5 hours to 6.5 hours.
兰渝铁路将使兰州至重庆间的客车运行时间从现在的17.5小时缩减至6.5小时。
2·Suitable for all kinds of cars, station wagon, medium and small-scale freight, the passenger train 's adjust, maintenance and Check.
适用于各类轿车,旅行车,中小型货运车及客车的四轮定位的检查,调整和维修保养。
3·Overhead lights signaled to engineer Rich Campana that the passenger train ahead was out of the way, and they could resume their normal speed of 40 miles per hour.
头顶上的灯向司机里奇·坎普纳发出信号,指示前面那辆客车已经开走,他们可以每小时40英里的正常速度继续运行。
4·In view of the immediate operation of Shangrao contact line, the author discussed the construction process, freight transportation diversion scheme and passenger train routes of the new line.
并针对上饶联络线即将开通的前景,对新线建设的进程、货运的分流方案及客车的径路三方面问题进行了探讨。
5·Secondly, on this basis, have proposed the road testing program of the urban passenger train of liquefied petroleum gas, research and analyse the road test of transforming the vehicle.
其次,在此基础上,提出了液化石油气城市客车的道路试验方案,并进行了改造车辆的道路试验研究分析。